Move your Fontana Conditional Use Permit project forward with professional project management, zoning research, application preparation, and City coordination.
Whether you’re evaluating commercial property, planning industrial development, or responding to Planning Division comments, Strom Permit helps manage the entitlement process from early due diligence through discretionary review.

A Conditional Use Permit in Fontana may involve zoning research, development plans, environmental review, technical studies, public notification, and discretionary approval.
Fontana regulates CUP applications under Municipal Code Chapter 30, Division 12.
The Planning Commission reviews standard CUP applications, while the Community Development Director considers qualifying Minor Use Permits under Division 13.
Both permit types have public hearing requirements.
Strom Permit coordinates application documents, consultants, City comments, revisions, and hearing preparation.
Our focus is identifying planning concerns early and keeping the entitlement process organized.
A Fontana property may appear suitable for a warehouse, medical facility, restaurant, school, retail business, or industrial operation while still requiring discretionary approval.
The City’s Chapter 30 Zoning and Development Code determines which uses are permitted, conditionally allowed, or subject to additional requirements.
Strom Permit can review:
Fontana provides interactive zoning and General Plan maps for preliminary property research.
Early due diligence helps identify restrictions before substantial money is committed to a lease, property purchase, architectural design, or improvements.


A Fontana CUP must demonstrate that the proposed use is appropriate for its location and compatible with surrounding development.
Under Section 30-150, required findings address zoning compliance, General Plan consistency, site suitability, access, utilities, and public welfare.
Depending on the project, Strom Permit may evaluate:
Fontana has several Specific Plans, including Southwest Industrial Park, West Gate, Sierra Lakes, and Walnut Village.
These plans establish location-specific land use and development standards.
Understanding applicable requirements before detailed design can reduce unnecessary revisions.
A Fontana CUP may involve property owners, architects, engineers, environmental consultants, Planning Division staff, and the appropriate hearing authority.
Strom Permit coordinates application preparation, supporting plans, consultant communication, City comments, environmental requirements, and hearing preparation.
Under Sections 30-147 and 30-175, applicants must request a pre-application review before filing. The City may waive this requirement for qualifying Minor Use Permit projects.
Fontana provides separate CUP and Minor Use Permit checklists for commercial, industrial, residential, and alcohol-related establishments.
Applications are submitted through the Build Fontana online permitting portal.
Required materials may include site plans, architectural drawings, ownership authorization, environmental information, and public notification documents.
We help track application completeness, outstanding comments, revisions, hearing preparation, and conditions of approval.MC39TW1


A discretionary Fontana project requires consideration under the California Environmental Quality Act (CEQA). Depending on the proposal, an exemption may apply or environmental documentation and technical studies may be necessary. We coordinate environmental consultants, City comments, documentation, and project revisions.







Fontana distinguishes between standard CUPs and Minor Use Permits (MUPs).
Conditional Use Permit: Requires a Planning Commission public hearing under Section 30-152.
Minor Use Permit: Requires a hearing before the Community Development Director under Section 30-180.
Under Section 30-23, hearing notices generally must be provided at least 10 calendar days before the hearing.
Notification typically includes property owners within 660 feet of the proposed project.
Applicant-initiated projects may also require on-site notification signs. Fontana’s commercial and industrial CUP checklist specifies a 4-by-8-foot sign on each street frontage.
Planning Commission CUP decisions may be appealed to the City Council. Minor Use Permit decisions may be appealed to the Planning Commission.
Fontana’s industrial and commercial development areas have distinct planning considerations.
Southwest Industrial Park Specific Plan: Covers areas containing manufacturing, warehousing, trucking, distribution, and vehicle storage operations.
West Gate Specific Plan: Establishes standards for a master-planned community with commercial, business park, residential, and public uses.
Sierra Lakes Specific Plan: Contains location-specific residential, commercial, and development requirements.
Industrial projects may require additional evaluation of truck circulation, outdoor storage, loading, noise, and nearby residential uses.
Strom Permit helps review these requirements alongside the property’s zoning and proposed development.


Already received comments from Fontana Planning?
Not sure whether your project requires a Conditional Use Permit, Minor Use Permit, Design Review, or another approval?
Considering commercial or industrial property but want to verify its zoning before signing a lease or purchasing?
Strom Permit can review the property, proposed use, and existing documentation to identify practical next steps.
Medical offices, clinics, laboratories, treatment facilities, and healthcare projects requiring discretionary land use review.
Multi-family housing, residential care facilities, mixed-use developments, and residential projects involving planning approvals.
Restaurants, retail businesses, professional offices, automotive-related uses, and commercial operations requiring CUP or zoning review.
Hotels, restaurants, entertainment venues, recreational facilities, and businesses where parking, noise, or operating hours may affect approval.
Warehouses, manufacturing facilities, distribution centers, logistics operations, outdoor storage, and industrial projects requiring discretionary review.
Churches, schools, childcare facilities, educational centers, training businesses, and institutional projects requiring zoning approval.
A Fontana CUP involves more than submitting an application.
The process may require compliance with Chapter 30, General Plan policies, Specific Plans, CEQA, public notification, and discretionary approval findings.
Some developments also require Design Review or Administrative Site Plan approval.
Industrial projects may face additional requirements involving truck circulation, loading, noise, site access, and surrounding land uses.
Strom Permit coordinates property owners, architects, engineers, consultants, and City staff.
We prioritize early research, organized documentation, clear communication, and practical management of outstanding issues.

Understanding the property’s zoning, CUP classification, Specific Plan requirements, and environmental considerations early can help prevent costly project changes.
Whether you’re preparing a Conditional Use Permit in Fontana, responding to City comments, or approaching a Planning Commission hearing, Strom Permit can help manage the entitlement process.
A Conditional Use Permit in Fontana is a discretionary approval required for certain uses that need additional review.
The City evaluates zoning compliance, site suitability, neighborhood compatibility, and public welfare.
The Fontana Planning Commission reviews standard CUP applications.
The Community Development Director reviews qualifying Minor Use Permits.
Yes. Standard CUPs require Planning Commission hearings under Section 30-152.
Minor Use Permits require Director-level hearings under Section 30-180.
Hearing notices generally cover property owners within 660 feet of the project.
Notice must ordinarily be provided at least 10 calendar days before the hearing.
Under Section 30-150, the City evaluates zoning compliance, General Plan consistency, site suitability, adequate access and utilities, and public health and safety.
Yes. Section 30-147 requires applicants to request pre-application review before submitting a standard CUP.
The City may waive pre-application review for qualifying Minor Use Permit projects.
Under Section 30-154, applicants generally must demonstrate good-faith commencement of the approved use within two years.
A qualifying extension of up to two additional years may be available.
Yes. We can investigate zoning, CUP requirements, previous approvals, Specific Plans, infrastructure conditions, and potential entitlement restrictions before a major financial commitment.